Log Date:
2026-01-28 00:00:00
Work done:
- Two stumps removed in a swale.
- Added extra pipe to climate control #2.
- Received parts for climate control #3.
- Received millet for spring planting.
- Continued work on website and research on the Osirieon.
Observations:
- There is no literature or research speculating on the possibility that the Osirieon has waveguide properties.
Farm Log Grow Site:


