Log Date: 
2026-01-28 00:00:00

Work done:

  • Two stumps removed in a swale. 
  • Added extra pipe to climate control #2.
  • Received parts for climate control #3.
  • Received millet for spring planting.
  • Continued work on website and research on the Osirieon.

Observations:

  • There is no literature or research speculating on the possibility that the Osirieon has waveguide properties.

 

Farm Log Grow Site: